le parc derrière les gites les travaux des deux premiers gites

2007- Working on the two first lodges


Already !

A rather dry and sunny fall . So the weather is with us to uncover the roof and the stonewalls .


Fortunately, I can rely on my old tractor to transport the rubble. This leads to an accumulation of waste to be evacuated by trucks. Sellers of old materials are asked to supply the site with original ground and roof flat tiles. However we need supplements because of the redistribution of some rooms.


The exterior façades renovation are “buttered” with lime and river sand as it used to be in the past. Spread on the stones in the early morning, this coating must harden in the sun to be scraped in the evening. But days decrease and here comes the freshness. Lime takes longer to dry than we thought and we have to wait until the next morning to go on. Then the work becomes more difficult.


Winter and Spring 2008 go by outside the West wing. An important digging work is planned. The grass around the cottages is ready to be sowed in the summer which allows the first set of photographs for “ Gîtes de France “.




domaine-de-frevent@nordnet.fr

PROJECT

RESERVATIONS

PLACE

CONTACT

TOURISM

RECEPTION

SEE  OUR  ACCOMODATIONS    >

Domaine De Frévent

Offer a good GIFT

Read the blog

SOUTH EAST OF PARIS

The pass times

Walking in the forest

Climbing

Horse riding


Events

Jazz festival

Harvest festival

Medieval festival


The culture

The castles

The museums

The villages


Holiday lodge booking

Bedroom booking

Tree house lodge booking

recommandé par les-cabanes.com